Project Experiences
Project Owner : PT. Pertamina (Persero)
Feasibility Analysis Study of Using Bright Gas Cylinder Sleeve Cover on 5.5 Kg Bright Gas Cylinder
Project Owner : PT. Dwimitra Barto Engineering
Review of the Calculation Results of the Column Improvement at the PLN Poncol Bekasi GIS Development Project
Project Owner : PT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan
Field Investigation Study of the 500 Kv Bojanegara – Balaraja Reconductoring
Project Owner : Badan Aksesibilitas Telekomunikasi Dan Informasi Kementerian Komunikasi dan Informasi
Study of BTS Multiyears Project 2020
Project Owner : PT. PLN (Persero) Unit Induk Pembangkitan Sumatera Bagian Utara
Calculation Study Services for Engineering Cost Estimate for Power Plant Relocation
Project Owner : PT. Indonesia Power
Consulting Service of Nusa Peninda Bali Hybrid PLTS Development Project
Project Owner : PT. Indonesia Power
Consulting Service of Nusa Peninda Bali Hybrid PLTS Development Project
Project Owner : Dinas SDA DKI Jakarta
Hydrological Survey and Analysis of Kamal Muara Polder System in the DKI Jakarta Rob Control and Coastal Development Sector
Project Owner : ConocoPhillips (Grissik) Ltd
For Study On 2020 Air and Green House Gas Emission Calculation & Automation Reporting Through Energy Component (EC) On Corridor Block - ConocoPhillips (Grissik) Ltd., Musi Banyuasin And Banyuasin Regencies, South Sumatera Province
Project Owner : ConocoPhillips (Grissik) Ltd
For Environmental & Reporting Support Service Corridor Block - ConocoPhillips (Grissik) Ltd., Musi Banyuasin And Banyuasin Regencies, South Sumatera Province